➤ Generator Testing & Commissioning
Insulation Resistance (IR) and winding resistance testing.
Excitation system and AVR functionality check.
No-load and load performance verification under rated conditions.
Synchronization testing with utility or parallel systems.
Protection relay testing for overload, short-circuit, and reverse power.
Noise level and vibration monitoring under full load.
Generator
Medium voltage






➤ Transformer Testing & Commissioning
Transformer Turns Ratio (TTR) and vector group verification.
Winding resistance, core insulation, and oil dielectric strength testing (for oil-filled types).
Polarity, phase displacement, and functional checks of protection devices (Buchholz relay, PRV, temperature sensors).
Pre-energization and post-energization thermal imaging.
Live load testing under monitored conditions with trend recording.
Transformer






➤ Switchgear Testing & Commissioning
Breaker timing tests, contact resistance, and mechanical operations.
Relay configuration and secondary injection testing.
CT/VT ratio verification and polarity testing.
Full functional testing of interlocks, remote operations, and protection coordination.
High-Potential (HiPot) and insulation resistance testing of busbars and feeders.
Earthing continuity, mechanical interlocking, and visual inspections.
Switchgear






➤Cable Testing & Commissioning
Continuity, IR, and sheath fault testing.
Very Low Frequency (VLF) or HiPot testing for insulation integrity.
Verification of phase sequence and proper terminations.
Earth resistance testing and lightning protection system continuity.
Thermographic inspection under load (post-energization).
Final commissioning report including test values and compliance checklist.