🟦 Control Panel Testing & Commissioning

Before commissioning, each control panel undergoes:

  • Insulation resistance testing (IR) and continuity checks of all circuits.

  • Function testing of breakers, relays, contactors, interlocks, and PLC I/Os.

  • Power-up and logic simulation to verify sequence control and feedback loops.

  • Load testing where applicable, along with integration testing with field devices.

  • Complete documentation and test reports provided.

low voltage

🟨 Lighting System Testing & Commissioning

We ensure lighting systems perform as designed through:

  • Lux level measurements in critical zones to meet lighting design specs.

  • IR testing of lighting circuits and verification of switch operations.

  • Emergency light function testing under simulated outage conditions.

  • Smart lighting control testing, including remote access or sensor-based automation.

  • Ensuring all safety and control devices are correctly operational..

🟩 Home Appliance Testing & Commissioning

After installation, each appliance is tested for:

  • Safe electrical connection, grounding, and voltage compatibility.

  • Functional testing under real operating conditions (e.g., heating, cooling, washing, etc.).

  • Performance testing of thermostats, timers, and user control panels.

  • Noise level and energy consumption checks for key appliances.

  • Safety checks including leak testing (e.g., for ACs), RCD response, and thermal protection verification.